Layer 1: This is the corrosion protective layer. This layer is of fusion bonded epoxy which offers very good corrosion protection. The fusion bonded epoxy has a very good bonding with the blasted steel surface.
Layer 2: This layer is the copolymer adhesive. The copolymer adhesive is a malefic anhydride grafted polyethylene compound. This material has good chemical bonding to the fusion bonded epoxy and the top layer polyethylene.
Layer 3: This layer is for physical protection and consists of polyethylene/Polypropylene. Since the copolymer adhesive and polyethylene are similar, they bond well with each other.
3LPE/PP coated steel pipes are mainly used in the following applications where the pipes are either buried or submerged:
Quis dignissim turpis suscipit dictum si ac eget augue diam lobortis enim ad pulvinar ipsum ante pharetra hac sapien quisque magnis
3LPE/PP pipes are coated according to the following standards:
| Capacity per Hour | FBE/3LPE/3LPP |
| Minimum Pipe Diameter | 360 (M2) |
| Maximum Pipe Diameter | 114.3 MM (4.5″) |
| Minimum Pipe Length | 1625.6 MM (64″) |
| Minimum Pipe Length | 9.0 M (29.52′) |
Increase gas flow Excellent Corrosion Resistance High Steel Adhesion Low mechanical & abrasion Resistance High Impermeability for water / gas Low Electrical Resistance Decrease line maintenance and up keep costs
| Type of Coating | Capacity | Coating |
|---|---|---|
| INTERNAL COATING |
360 SQM/HOUR 219.1mm to 1626mm PIPE SIZE – 8″ - 64″ LENGTH – 9 to 12.8 Meters 29.53 to 42 feet |
INTERNAL CLEANING & SPRAY PAINTING |